How to Adjust the New Concrete Batching Plant?

First of all, when the Concrete Batching Plant is installed, commissioning is an indispensable step, after commissioning is completed, users can rest assured that use.

1.When debugging the control system, reset the pressing button, close the open power in the electrical cabinet, and successively close each branch circuit breaker, control loop power switch and control room power switch after connecting, and observe whether there is any abnormal phenomenon in the electrical system.

2.Open the button of each motor to test whether the steering of the motor is accurate. If it is not accurate, it should be adjusted immediately.

3.Start the air compressor of the concrete mixing station. After the air pressure reaches the requirements, start each air control door according to the button marking in sequence, check whether the action is sensitive, and adjust the sensitivity of the microcomputer.

4.Check whether the switch of the air compressor is normal, whether the barometer is accurate, and adjust the pressure of the safety valve to the standard range.

5.Test the mixer to see if there is abnormal sound and whether each component can work normally.

6.When the belt machine is debug, it needs to be operated. In the process of operation, it is necessary to check whether the operation of each idler is sensitive.

7.When debugging the concrete batching machine, we must press the batching button more to see if it is sensitive and can be equipped with accuracy, and then refer to the debugging of batching.

8.After the commissioning, the concrete mixing plant can be produced.

 