Construction Equipment Project Of The Three Major Considerations
Author: zhenhengTime: 2017-10-16 10:06:10
The demand for today's society is relatively large. The demand for building materials is relatively large. In life, we are building materials for processing and mixing, which are often used for machines and equipment that have been known as mixing devices for stations. Then in the construction of such equipment when we should pay attention to what?
1, pay attention to climate change, the structural layer of cement stabilized soil temperature should be JS concrete mixer in the late spring and construction organization. Day construction period of the minimum temperature should be 5 or more, concrete mixing, a frozen area, should be in the first week to a month to re-freeze, as far as possible ahead of schedule.
2. During the rainy season to build cement stabilized soil, especially when the soil cement, mixing station, cement concrete structure layer and rain water mixed. Fall should stop construction, but has been covered with dense cement mixture clay brick manufacturing machinery as soon as possible.
3. Take a mixed road construction, concrete mixing, take measures to remove the surface of the aquifer, so that the road aggregate transport excessive moisture